Skip to content

Traditional Bath Design

Scope of Work:

  • Master bath remodel
  • Run plumbing and electrical to relocate the washer and dryer from the first floor to the master bath
  • Frame out and build custom shelves behind the tub
  • Convert bathroom door to pocket door
  • Replace all materials except for the window

Year Built : 1900

Location : Washington, DC 20003

Features:

Total as designed and per selections (excluding appliances): $51,347

Appliances:

Total for appliances: $2,248

Related posts

Traditional Bath Design